Main Street TIP Project

  • Project Name:    Main Street TIP Project                                        
  • Project Description:    Reconstruct the Main Street corridor from Fairlawn Avenue to Front Street with accessible sidewalks and ramps, separated bike facilities, transit bus stops, traffic calming measures, and traffic signal upgrades at the downtown intersection.                                         
  • Project Goals:    Reimagine Oxford's downtown to promote multimodal travel and develop a safer, more accessible corridor for all modes and roadway users of all abilities.                                        
  • Location:    Main Street from Front St. to Fairlawn Ave.                                        
  • Construction Begins:    Winter 2028                                        
  • Construction Ends:    Fall 2030                                        
  • Contact Person:    Kevin Duffy, Director of Public Works                                        
  • Cost:    $17,746,000 (January 2026)                                         
  • Contractor:    Design Engineer - The Engineering Corp.                                         
  • Current Status:    

    • 25% Design submitted to MassDOT for review December 2024  

    • Design Public Hearing - Tuesday January 13th at 6:30 PM (see links below)Main St TIP Project         

Oxford Roadway Rehabilitation on Route 12 Main Street Proj No. 611988 Virtual Event Confirmation Notice  

FLYER Oxford Roadway Rehabilitation on Route 12 Main Street Proj No. 611988 Virtual Event