Millbury Road Resurfacing

  • Project Name: Millbury Road Cold-In-Place Recycling/ Hot Mix Asphalt Shim & Overlay FY2025(Partial)
  • Project Description: The Town has resurfaced the road pavement on Millbury Road with a Cold-In-Place (CIP) base construction followed by a hot mix asphalt (HMA) surface course. In one continuous operation, the top 2 to 5 inches of distressed asphalt were cold-milled to produce reclaimed asphalt pavement (RAP). The RAP was then mixed with strengthening additives and placed back onto the existing roadway.  The CIP process produces a longer lasting roadway surface than a mill and overlay or a shim and overlay and is much faster than conventional reclamation.  Once the CIP was been completed, a surface course of HMA was installed to extend the life of the roadway even further.
  • Project Goals: Provide a uniform cross section and profile on the roadway to the extent feasible, provide structural improvement, reduce wear & tear on Town’s fleet, and significantly improve rideability for all roadway users. 
  • Location: Millbury Road from Depot Road to the Auburn Town Line
  • Construction Begins: Summer 2024
  • Construction Complete: Summer 2024 
  • Contact Person:  Peter Gerhard, Asst. Director of Public Works
  • Cost: CIP $153,317.80; HMA $170,000
  • Contractor: Indus, Inc. (CIP) and Massachusetts Broken Stone Company (HMA)Millbury Road Resurfacing